CASE HISTORY
|
|
Customer:
SHERATON HOTEL - Padua
<%--
Obiettivo:
--%>
Description:
Fire-fighting system realized in 2005 at the Hotel Sharaton in Padua where have been installed some DAB fire-fighting booster sets , both with electrical motor pumps and diesel motor pumps, in conformity with Uni 9490 - Uni 10779 Standards.
|
|
|
|
Customer:
VERDI THEATRE - Pordenone
<%--
Obiettivo:
--%>
Description:
Fire-fighting system realized in 2004 at the Verdi Theatre in Pordenone, where have been installed someDAB fire-fighting booster sets , NKP-G series in conformity with Uni 9490 - Uni 10779 Standards.
|
|
|
|
Customer:
Aviano and Rivolto Military Bases
<%--
Obiettivo:
--%>
Description:
Fire-fighting systems realized in 2005 and 2004 at Aviano and Rivolto (PN) national military bases, where have been installed some DAB fire-fighting booster sets; in conformity with Uni 9490 - Uni 10779 Standards. The above military bases are the national headquarter of acrobatic air patrol "Frecce Tricolori".
|
|
|
|
Customer:
TIVOLI HOSPITAL (Rome)
<%--
Obiettivo:
--%>
Description:
A complete supply has been provided for the realization of the Heating Power Plant at the Tivoli Hospital,where DAB circulators and in-line DAB electrical pumps are installed.
|
|
|
|
Customer:
FINANCE MINISTRY (Rome)
<%--
Obiettivo:
--%>
Description:
Fire-fighting system realized in November 2005 at the Finance Ministry building in which has been installed a DAB fire-fighting booster sets , with diesel motor pumps, in conformity with Uni 9490 - Uni 10779 Standards.
|
|
|
|
Customer:
SPORT FACILITIES - ORBETELLO (Grosseto) GOLF COURSE
<%--
Obiettivo:
--%>
Description:
In 2004 DAB supplied the materials for the realization of the new irrigation system at the Golf Club of Orbetello, provided with a booster set with 4 electrical normalized pumps controlled by frequency inverter.
|
|
|
|
Customer:
VICENZA OLIMPIC THEATRE
<%--
Obiettivo:
--%>
Description:
The supply for the renovation of all the infrastructures is about to be completed at the Vicenza Olympic Theatre, the works are expected to be completed by February 2006;here are installed DAB circulators, in-line DAB electrical pumps , normalized DAB pumps and DAB fire-fighting booster sets in conformity with Uni 9490 - Uni 10779 Standards.
|
|
|
|
Customer:
VARESE HOSPITAL
<%--
Obiettivo:
--%>
Description:
A complete supply of In-line pumps (CM - CP series), flanged circulators (BPH-DMH series) and Normalized pumps has been provided for the realization of the new Heating Power Plant at the Varese Hospital. The supply has been provided also with DAB fire-fighting booster sets, in conformity with Uni 9490 - Uni 10779 Standards.
|
|
|
|
Customer:
FRIULI VENEZIA GIULIA - INTERNATIONAL AIRPORT
<%--
Obiettivo:
--%>
Description:
New fire-fighting system realized at Friuli Venezia Giulia International Airport, where DAB fire-fighting booster sets, in conformity with Uni 9490 - Uni 10779 Standards, have been installed.
|
|
|
|
Customer:
ITALIAN RAILWAYS
<%--
Obiettivo:
--%>
Description:
Fire-fighting system realized in 2005 at Cervignano interport (ordered by Italian Railways ), where have been installed some DAB fire-fighting booster sets , both with electrical motor pumps and diesel motor pumps, in conformity with Uni 9490 - Uni 10779 Standards.
|
|
|
|
|
|