Before starting the pump, check that: the pump has been properly primed, filling the pump body completely. This ensures that the pump immediately starts to work regularly and that the seal (mechanical seal or stuffing box seal) is well lubricated. Dry operation causes irreparable damage to the mechanical seal and the stuffing box seal. the auxiliary circuits have been correctly connected; - all the moving parts have been protected with suitable safety systems; - the electrical connection has been made as indicated previously; - pump-motor alignment has been correctly performed.
The product manual available here on our site or here in our DNA software provides useful information for the usage and maintenance of this product.
Global | en
About DAB