Verty Nova

Verty Nova

Insert the plug on the power cord in a suitable power socket.


Automatic operation (A):

  • the integrated float switch starts and stops the pump automatically when the indicator (2) is positioned on “A”.

Manual operation (M):

  • To start the pump, lift the knob (3) positioning the indicator (2) on “M”. In these conditions the suction level of the pump will be down to 2-3 mm.


In order to check the correct working and clean the float switch open the cover (1) positioning the indicator on “O”.
We recommend you read the instruction manual of the Verty Nova (also available in our DNA software) for useful information for use, maintenance and installation.

The most common problem is due to the blockage due to overheating of the motor, because the pump is equipped with a thermal motor protection switch that in case of overheating of the motor automatically switches off the pump. The cooling time is about 15-20 minutes, after which the pump automatically switches on again. After the intervention of the motor protection switch, it is necessary to search for the cause and eliminate it.

Verty Nova troubleshooting

We recommend you read the instruction manual of the Verty Nova (also available in our DNA software) for useful information for use, maintenance and installation.

The length of the power cord is no more than 10 meters. Any extension cords must comply with the requirements of the DIN VDE standard 0620. We recommend you read the instruction manual of the Verty Nova (also available in our DNA software) for useful information for use, maintenance and installation.